Spending on what the city builds and keeps
Official: National Treasury · Data as of 2024-25 financial year (audited) · Last updated
Two of Treasury’s norms: spend 95% to 100% of the capital budget (new, renewed and upgraded assets), and spend about 8% of the value of property, plant and equipment on repairs and maintenance each year.
What these words mean
Capital budget
Money set aside to build, renew or upgrade things that last for years: pipes, roads, substations, clinics.
Adjusted budget
The budget after the council’s mid-year changes. Spending is measured against this one.
Repairs and maintenance
Spending to keep existing roads, pipes and buildings working. Treasury’s guideline is about 8% of what those assets are worth each year.
Property, plant and equipment
Everything physical a metro owns and uses: networks, roads, buildings, vehicles. Its value is the yardstick for maintenance.
Treasury norm
A target National Treasury sets for every municipality in MFMA Circular 71, so metros can be compared on the same scale.
Capital budget spent · 2023-24
101.3%
Only Ekurhuleni met Treasury’s norm of 95% to 100%. Capital (new, renewed and upgraded assets) spent, as a share of the adjusted capital budget.
None of the 7 metros with a figure met Treasury’s norm of 8%. Spending on repairs and maintenance as a share of the value of property, plant and equipment.
Treasury norm (Circular 71): 8%. The thin lines on the bars mark it.
Source: National Treasury, Municipal Money. Each figure links to its exact query. Calculated with the Circular 71 formula (see How we work).
*1 As reported to National Treasury. This figure is inconsistent with the possible range for repairs and maintenance as a share of asset value (0 to 50) and may be a reporting error.
Source: National Treasury, Municipal Money, capital_v2 (new, renewal and upgrading of assets). Each amount links to its exact query. Audited spend is the audited actual. Monthly reports are the sum of the unaudited Section 71 monthly figures, for reference only. Automated checks: audited spend above 1.5 times the original budget, covering fewer than half the functions in the monthly reports, more than 25% away from the sum of 12 monthly reports, or more than 3 times (or under a third of) the year before; monthly figures with a single month above half the annual budget, or a large entry later reversed.
*1 As reported to National Treasury. This figure is inconsistent with the sum of the 12 monthly reports to Treasury (it differs from that figure by 31%) and may be a reporting error.
*2 As reported to National Treasury. This figure is inconsistent with the original budget (it is 4.6 times the budget); and with the monthly reports (it covers 1 of the 27 functions they list) and may be a reporting error.
*3 As reported to National Treasury. This figure is inconsistent with the monthly reports (it covers 2 of the 24 functions they list); and with the year before (it is 14.8 times smaller than the 2022-23 figure) and may be a reporting error.
*4 As reported to National Treasury. This figure is inconsistent with the original budget (month 11 alone is 61% of it) and may be a reporting error.
*5 As reported to National Treasury. This figure is inconsistent with the sum of the 12 monthly reports to Treasury (it differs from that figure by 49%) and may be a reporting error.
*6 As reported to National Treasury. This figure is inconsistent with the sum of the 12 monthly reports to Treasury (it differs from that figure by 39%) and may be a reporting error.
*7 As reported to National Treasury. This figure is inconsistent with the original budget (it is 19.4 times the budget); and with the year before (it is 22.2 times the 2023-24 figure) and may be a reporting error.
*8 As reported to National Treasury. This figure is inconsistent with the original budget (it is 19.5 times the budget); and with the sum of the 12 monthly reports to Treasury (it differs from that figure by 1735%) and may be a reporting error.
*9 As reported to National Treasury. This figure is inconsistent with the sum of the 12 monthly reports to Treasury (it differs from that figure by 47%); and with the year before (it is 19.9 times smaller than the 2022-23 figure) and may be a reporting error.
*10 As reported to National Treasury. This figure is inconsistent with the original budget (month 1 alone is 1581% of it); and with normal monthly reporting (a large entry in month 1 is reversed in month 4) and may be a reporting error.
*11 As reported to National Treasury. This figure is inconsistent with the sum of the 12 monthly reports to Treasury (it differs from that figure by 32%) and may be a reporting error.
2025-26, unaudited: capital spending
Official: National Treasury, Section 71 (unaudited) · Data as of 30 June 2026 (2025-26, 12 of 12 months, unaudited) · Next update expected November 2026 (Treasury’s next quarterly Section 71 release)
Capital spending as a share of the adjusted budget · 2025-26, 12 months
Official: National Treasury, Section 71 2025-26 quarter 4 (unaudited). Unaudited figures as each metro reported them; audited figures follow about six months after the year ends.
*1 As reported to National Treasury, Section 71 2025-26 quarter 4 (unaudited). This figure is inconsistent with capital spending by source of finance in the same report and may be a reporting error.
Unaudited: what each metro reported to National Treasury for the full year (preliminary) of 2025-26, to 30 June 2026. Capital spending here covers every kind of capital project, so it is wider than the audited “new, renewed and upgraded assets” measure above. The audited years stay the reference; these figures are not used in headlines. Source: Treasury’s summary of metros workbook (all files).
Infrastructure grants: given vs spent
Official: National Treasury, Municipal Money (spending unaudited) · Data as of 2025-26 financial year (spending unaudited) · Last updated
In 2023-24, the 3 metros with all 12 monthly reports spent 65% of their Urban Settlements Development Grant (R2.58bn of R3.99bn).
What these words mean
Infrastructure grants
Money national government gives metros for a set purpose, such as housing land and services or public transport. Unspent money can be taken back.
* eThekwini, NDPG: as reported to National Treasury. This figure is inconsistent with the nature of spending, which cannot be negative and may be a reporting error.
USDG: Urban Settlements Development Grant (land, services and housing). PTNG: Public Transport Network Grant (bus rapid transit and other public transport). NDPG: Neighbourhood Development Partnership Grant. RBIG: Regional Bulk Infrastructure Grant (bulk water and sanitation). Spending is what the metro reported each month, added up; fewer than 12 reports means part of the year is missing, and one report can hold a whole year. Treasury’s dataset has no 2024-25 grant figures. Source: National Treasury, Municipal Money, grants (one query per metro; this link is for Cape Town).
Still to come on this page
Big projects: budget, progress and completion.Each metro’s capital budget and annual report · no official source lists metro projects as data: Treasury publishes only totals, and project lists sit inside each metro’s budget and annual-report documents, in different layouts