The Ledger SA

Electricity · Eastern Cape

Nelson Mandela Bay

How often is it off? Who produces our power?

26.8%

of the electricity bought or generated was lost before it was sold in 2024-25. Treasury’s norm is 7% to 10%.

Official: Audited annual financial statements · Data as of 2024-25 financial year (audited statements) · Next update expected Jan 2027 (2025-26 annual reports) · Last updated

Compare all eight metros: Electricity. An asterisk marks a figure our automated checks found inconsistent with another official figure; it is shown as reported, explained in a footnote and left out of rankings.

Electricity lost before it is sold

Official: audited annual financial statements · Data as of 2024-25 financial year (audited statements) · Next update expected Jan 2027 (2025-26 annual reports) · Last updated

Electricity a metro buys or generates but never bills: technical losses in the network, theft and faulty meters. Treasury’s norm is 7% to 10%.

What these words mean
Distribution losses
Water or electricity a metro buys or produces but never bills: leaks, theft, illegal connections and faulty meters.
Treasury norm
A target National Treasury sets for every municipality in MFMA Circular 71, so metros can be compared on the same scale.
Electricity lost in distribution · 2024-25

26.8%

Treasury norm: 7% to 10%

Share of electricity bought or generated that is lost before it is sold.

Source: Nelson Mandela Bay’s audited annual financial statements.

Power outage notices

Official: Nelson Mandela Bay Municipality, alerts · Data as of see each notice’s date · Updates: checked daily · Last updated

256 power interruption notices from Nelson Mandela Bay since 1 Jan 2025; 107 named places we could match to wards.

Wards named most often (2021 boundaries), notices since 1 Jan 2025
Ward 3019Ward 5316Ward 2313Ward 4013Ward 5413Ward 5513Ward 5613Ward 5713Ward 5813Ward 5913

Latest notices

Places are matched by their Stats SA Census 2011 names, longest name first, with no guessing; a name we cannot match is listed for checking and not linked to a ward. Notices before 1 Jan 2025 are not included. Where a metro publishes no notices, residents can report an outage (community reports, unverified).

Load shedding by year

6 948 hours in 2023, against 1 656 hours in 2024. It last happened on 26 Mar 2024, by the CSIR’s count.

Independent source: CSIR Energy Centre, Utility-scale power generation statistics in South Africa 2024, page 69. The CSIR estimates these from Eskom’s announcements; not an official statistic, and not used in our rankings. The report. Data as of 2024 (latest annual report) · Updates: the CSIR publishes once a year.